Snagging Checklist for Dubai Property Handover: What to Check, Room by Room

A snagging checklist is a structured list of the finishes, fixtures and systems to test in a new property before you accept it from the developer. Working through one at the inspection appointment, and before you sign the handover form, turns a quick look around the unit into a written record of every defect the developer still needs to fix.

This checklist follows the order most inspections take in a Dubai apartment or villa, from walls and floors through electrics, plumbing and air conditioning to balconies and external areas. It also marks the points where a visual check runs out and instrument-based testing is needed. For what usually causes these defects, see our guide to common snagging issues in Dubai properties.

Before You Start: Timing, Utilities and What to Bring

Arrange the visit for daylight hours and after the developer has cleaned the unit, so marks and scratches are visible. Ask for DEWA power and water and the cooling supply to be live, because sockets, taps, drains and AC units cannot be judged on dead systems. Bring the floor plan and finishes schedule from your sale and purchase agreement, so you can confirm that what was installed matches what was specified.

A short kit makes the walkthrough faster:

Walls, Ceilings and Floors

Hold a torch flat against each wall and look along the surface. Low-angle light shows bumps, patching and uneven paint that are invisible when you look at the wall head-on.

Doors, Windows and Joinery

Electrical Checks

Electrical snags are easy to miss because a working light says very little about the circuit behind it. A buyer can check function and labelling. Insulation, earthing and loose connections need proper test equipment, which is where a technical inspection adds the most value.

Plumbing and Drainage

Run water at every outlet for long enough to see how the system behaves, not just whether water comes out.

Air Conditioning and Ventilation

In Dubai’s climate, cooling faults are the snags you notice fastest after moving in, and they can be hard to prove once the unit is occupied.

Kitchen and Bathrooms

Balconies, Terraces and External Areas

What a Walkthrough Cannot Tell You

A careful checklist catches most visible defects. It cannot measure what is happening inside walls, cables and ducts, which is where a professional inspection goes further than a buyer’s walkthrough.

Area What you can check yourself What needs testing
Electrical Sockets work, switches operate, the board is labelled Insulation resistance, earthing and loose or overheating connections
Moisture and leaks Visible stains and damp patches Hidden moisture behind tiles and above ceilings, traced with thermal imaging
Air conditioning Each zone feels cool and fans run Airflow and cooling performance measured against the design
Ductwork Grilles blow air Air leaking from ducts inside ceiling voids

A professional snagging inspection in Dubai from Malcots is carried out by a team that also provides infrared thermography, electrical testing, duct leakage testing and HVAC testing and commissioning, so findings that need a closer look can be followed up properly.

How to Record Snags So the Developer Acts on Them

A snag list only works if the developer’s team can find each item without you standing next to them. Record every defect with four things: the room, the exact location (for example, master bathroom, left of the basin, 30 cm above the floor), a short description of the problem and two photographs, one wide enough to show where it is and one close enough to show the defect itself.

Number the items, mark each one on site with a piece of tape, and group them by room so a site team can work through the list in order. Submit it in writing through the customer care channel named in your sale and purchase agreement, ask for a written acknowledgement, and keep copies of everything you send and receive.

What Happens After You Submit the Snag List

The developer schedules rectification and should tell you when the work is complete. Check each item again before you sign acceptance, ideally against the same numbered list, and record anything still open on or alongside the handover documents.

Responsibility does not end at handover. For jointly owned properties, Article 40 of Dubai Law No. 6 of 2019 makes developers liable for repairing defective installations for one year from the handover of the unit, and structural defects for ten years from the project’s completion certificate. Our guide to snagging and the defects liability period in Dubai explains how to use that window.

Frequently Asked Questions

Can I do my own snagging in Dubai?

Yes. Nothing stops a buyer from inspecting their own unit, and this checklist covers the visible defects most walkthroughs find. The limits are experience and equipment: a walkthrough cannot confirm insulation, earthing, hidden leaks or airflow, which is where a professional inspection adds value.

Should I sign the handover form if snags are still open?

Read the form carefully before signing. If you do sign with snags outstanding, make sure the snag list is attached or referenced and that the developer has acknowledged it in writing, so there is no question that the defects existed at handover.

Is a snagging checklist the same as a snagging report?

No. A checklist tells you what to look at. A snagging report is the result: the numbered list of defects found, with locations and photographs, that you send to the developer.